- Tim Fallon, Project Director of PBS39 at SteelStacks, and Lynn Olanoff, reporter for The Express-Times
- Studio B
- Studio A
- Future home of the Production department
- Lobby Interior
- View from Lobby
- Lobby Interior
- Exterior View-Glass to be installed shortly
- Exterior Side Door to Studios A and B
- American Steel – from Erie, PA
- Entrance – future home of 16′ x 9′ screen above the door
- View from Community Room
- Community Room
- Our neighbor, ArtsQuest
- 1st Floor Interior
- Steel Construction 11.23.2010
- First Steel Erected 11.18.2010
- Foundation completed 11.18.2010
- PBS39 Site Preparation
- Construction Began September 14, 2010
- Blast Furnaces at SteelStacks